Project-confirmed Specification
A parameter that should not be published as fixed because it depends on bottle data, mold scope, line layout or engineering confirmation.
Treat project-confirmed values as engineering questions, not missing catalog quality.
RFQ checks
Send bottle drawings, material, target output, mold scope and destination before engineering compares the machine and mold route.
- Move from product route to the bottle data needed for engineering review.
- Send bottle drawings, material, target output, mold scope and destination before price comparison.
- Bottle volume, neck finish and sample photo or drawing.
- Target output and material route: PET, PP, PETG, Tritan or PPSU.
- Preferred machine model, mold cavity target and destination country.
- Mold only, machine only or complete line scope.
- Move from generic catalog browsing to project examples, comparison tables and RFQ checklists.
- Standardize bottle, preform, mold, output and auxiliary data before the first quotation.
- Compare route fit, data confidence and next steps before sales replies to the RFQ.