HTML + PDF sheet

Auxiliary Line Planning Sheet

A utility and handoff planning sheet for air, cooling, conveyor, filling, packing and factory layout assumptions.

Direct answer

What this tool does.

Use this sheet when the quote should include auxiliary equipment or complete PET bottle production line planning.

  • Machine route: Selected model, Bottle output, Bottle size, Mold scope
  • Utilities: Compressed air assumptions, Cooling or chiller needs, Voltage context, Factory conditions
  • Handoff: Bottle discharge, Conveyor height, Filling interface, Packing flow
  • Support: Destination country, Installation guidance, Training needs, Spare parts expectations
RFQ worksheet

Use these fields before requesting a machine or mold quote.

Share this printable fill-in worksheet with engineering, purchasing or a distributor before submitting drawings, photos and target output.

Checklist section

Machine route

  • Selected model
  • Bottle output
  • Bottle size
  • Mold scope
Checklist section

Utilities

  • Compressed air assumptions
  • Cooling or chiller needs
  • Voltage context
  • Factory conditions
Checklist section

Handoff

  • Bottle discharge
  • Conveyor height
  • Filling interface
  • Packing flow
Checklist section

Support

  • Destination country
  • Installation guidance
  • Training needs
  • Spare parts expectations
Related products

Products connected to this RFQ worksheet.

Open the product page after the buyer-side data package is ready.

Bottle Blowing Equipment

KRC5000-I

Higher-output bottle blowing machine for projects that need more capacity than the KRC900 family and production-line planning support.

View product
Auxiliary Equipment

Auxiliary Equipment Planning

Auxiliary equipment planning for bottle line support where air, cooling, conveyor and layout handoff are reviewed before quotation.

View product
Auxiliary Equipment

Air Compressor Planning

Compressed air planning for bottle blowing lines, including pressure, air volume, dryer and handoff assumptions before quotation.

View product
More related pages
FAQ

Download questions.

When should auxiliary equipment be included?

Include it when air, cooling, conveyor, filling or packing handoff affects the quote.

Can auxiliary equipment be selected before the machine?

Only roughly. Reliable planning needs the machine route, output target and factory layout.